Project Scope and Key Deliverables:
Phased Facility Layout: A highly functional three-storey design comprising a basement level for storage and staff shower/changing facilities; a ground floor featuring a new reception area, two X-ray rooms, an ultrasound suite, and associated offices; and a first floor delivering office and study space with designed flexibility for future development.
Seamless Integration: Complex structural and service integration with the existing hospital infrastructure, ensuring the new extension connects flawlessly to the live Clinic and Outpatient Facility to support uninterrupted patient flow.
Sustainable Construction: Implementation of modern environmental standards, including the installation of rooftop PV panels, highly efficient plant equipment, and a subterranean attenuation system to effectively manage stormwater.
Safety & Accessibility: Enhanced life-safety measures incorporated throughout, including the construction of a new external fire escape staircase and strict adherence to modern accessibility standards.
Live Campus Operations: Meticulous management of construction activities to deliver a major 900m² extension while maintaining stringent infection control, dust mitigation, and zero disruption to the daily operations of a sensitive orthopaedic hospital.